Transboundary EIA procedures, in which Bulgaria is affected country

  • Construction of section 3 of rail corridor VIII: Kriva Palanka-Border with the Republic of Bulgaria

          – Letter from Ministry of Environment and Physical Planning of the Republic of Macedonia (No11-2504 from 11 August 2017) with notification for investment prposal

|          –Response from Ministry of Environment and Water of the Republic of Bulgaria (No 04-00-1504/05 Oct. 2017)

           -Decision (No11-5508 from 14 November 2017) to determine the need for EIA of project 9received by e-mail on 22 November 2017) and Non-technical Summary en bulgarian, macedonian and english language

            Letter  ( No 04-00-1504 from 21 December 2017) from the Ministry of Environment and Water for Transboundary Part  with EIA for the border section of the railwayq respectively Tunnel 22

  • Site extension of the Intermediate Dry Spent Fuel Storage Facility (IDSFS) of Cherna voda Nuclear Power Plant and continuing to build the MACSTOR 400 type modules

Notification (No1301/DC/23.02.2017) from Ministry of Environment of Republic of Romania

  • Construction of an experimental „pilot“ facility for technology testing of flotation processing of copper, lead and zinc ore on the territory of Karamanica,municipality of Bosilegrad,Republic of Serbia

Notification from Ministry of Agriculture and Environmental Protection of Serbia (No 04-00-1898/22.08.2016)

Response from Ministry of Environment and Water of the Republic of Bulgaria (No 99-00-161/11 Oct. 2016)

  • Consrtruction of a depot for phospphogypsum storage

Letter from Ministry of Agriculture and Environmental Protection of Serbia (No OVOS-19/07.05.2015) with notification for investment proposal and non-technical summary

-Response from Ministry of Environment and Water of Bulgaria (No OVOS-19/21.05.2015)

Response from Ministry of Environment and Water of Bulgaria (No OVOS-19/02.10.2015)

  • Consultation regarding the EIA for Construction of ne units of the Paks NPP, Hungary

Notification for investment proposal from Hungary

Response from Ministry of Environment and Water of Bulgaria

  • Rehabilitation and modernization of the water transport infrastructure in the ports outside Ten-T network-Bechet Port“, Bechet locality, Dolj county, Romania

Notification for investment proposal from Ministry of Environment and Forests of Romania

Response from Ministry of Environment and Water of Bulgaria

  • The development of the Arges and Dambovitsa rivers for navigation and other uses

Notification from the Ministry of Environment and Forests of the Republic of Romania (No3034/RP/03.07.2012)

Response from the Ministry of Environment and Water of the Republic of Bulgaria (No OVOS-240/15.08.2012)

Scoping guidelines elaborated by Ministry of Environment and Forests of the Republic of Romania to define the content of the EIA report (No 3811/RP/19.10.2012)

Response from the Ministry of Environment and Water of Bulgaria (No OVOS-240/06.12.2012)

-Letter from the Ministry of Environment, Water and Forests of the Republic of Romania (No 3077/G.L.G/29.01.2015) with Potential Transboundary Impact for Site Natura 2000 in Bulgaria and Annex to the Appropriate Assesment Study for the Natura 2000 sites in Bulgaria

Letter from the Ministry of Environment and Water of the Republic of Bulgaria regarding addres No 3077/G.L.G/29.01.2015

Letter (No4973/GLG/21.06.2017) from the Ministry of Environment of the Republic of Romania in which informs that Romanian National Environmental Protection Agency has taken the decision to reject the application for the environmental aggreement

  • Romania – Turkey High Voltage Direct Current (HVDC) Interconnection Link

Notification from the Ministry of Environment and Forestry of Romania

Responce of the Bulgarian Ministry of Environment and Water

  • Extraction of phosphorite ore from the “Lesina” deposit near Bosilegrad production of phosphate concentrate

– Notification from the Ministry of Environment and Spatial Planning of Republic Serbia

– Responce of the Bulgarian Ministry of Environment and Water

  • Continued construction works and completion of Units 3 and 4 of Cernavodă NPP

Notification to an affected party of a proposed activity under Article 3 of the Convention

-Final decision for project NPP Cernavoda Units 3 and 4 (en and ro)