Construction of section 3 of rail corridor VIII: Kriva Palanka-Border with the Republic of Bulgaria

   – Letter from Ministry of Environment and Physical Planning of the Republic of Macedonia (No11-2504 from 11 August 2017) with notification for investment proposal

| – Response from Ministry of Environment and Water of the Republic of Bulgaria (No 04-00-1504/05 Oct. 2017)

  – Decision (No11-5508 from 14 November 2017) to determine the need for EIA of project 9 received by e-mail on 22 November 2017) and Non-technical Summary in bulgarian, macedonian and english language

   – Letter  ( No 04-00-1504 from 21 December 2017) from the Ministry of Environment and Water for Transboundary Part  with EIA for the border section of the railway respectively Tunnel 22

   – Letter (No 04-00-1504 from 02 April 2018) from Ministry of Environment and Water of Bulgaria